Share BuyProducts Channel
1/5
Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv / 1Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv / 2Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv / 3

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

2022-11-11 15:338960
Price ¥1100.00/Piece
Min quantity 1Piece
Quantity 999999Piece


Product Description

* This model is produced in accordance with Chinese national GB standards and the international IEC standards.
* It uses oil as the main insulation means of the transformer, and relies on oil as the cooling medium, such as oil-immersed natural cooling, oil-immersed air cooling, etc.
* Widely used in chemical plants, factories, remote places and other harsh environments.

 

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

 

Product Features:
The S11 series fully sealed oil-immersed power transformer developed and produced by the company has the advantages of low loss, low noise and high efficiency, which can achieve good energy-saving effects and reduce pollution.
The transformer is isolated from the air to prevent and slow down the deterioration of oil and insulation aging so as to enhance operational reliability, and maintain normal operation without maintenance.


1.The transformer core is laminated with imported cold-rolled silicon steel sheets, which greatly reduces the no-load loss and no-load current. The core is bound to ensure the tightness of the core and reduce noise.
2.High and low voltage windings are made of oxygen-free copper, and low voltage windings of 500kVA and below adopt double-layer cylindrical structure. 630kVA and above adopt double helix or four helix structure, high voltage winding adopts multilayer cylindrical structure. 1000kVA and above can adopt foil winding.
3.The transformer connection group uses Dyn11 to reduce the impact of harmonics on the power grid and improve the quality of power supply.
4.The transformer is a fully sealed structure, which prolongs the service life, does not require hanging cores and maintenance.
5.The measured noise value is lower than the standard. After this series of transformers have been transported normally, the relevant parts can be installed without core inspection, and they can be put into operation once the acceptance test is qualified.

 

Product Standard:
GB/T 1094 Power Transformer
GB/T 15164 Oil-immersed Power Transformer Load Guide
GB/T 6451 Three-phase Oil-immersed Power Transformer Technical Parameters and Requirements
GB/T 2536 Transformer Oil
GB/T 311.1 Insulation Coordination of High-voltage Power Transmission and Transformation Equipment
GB/T 10237 Insulation Level of Power Transformer and Air Gap of External Insulation in Insulation Test
DL/T 572 Transformer Operation Regulations

IEC60076

 

Applicable Environment:
1.High ambient temperature: +40℃
2.Low ambient temperature: -25℃
3.Altitude: <1000m. We can also customize according to your demand.
4.Monthly average relative humidity: 90% (20℃)
5.Installation location: Chemical plants, factories, remote places and other harsh environments.

 

Model Implication:

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

 

Technical Parameter:

Technical Parameter for S11 Series 20kv No-load Voltage Regulation Transformer 
Rated Capacity (KVA)Voltage CombinationConnection Group SymbolNo-load Loss R(W)Load Loss R(W)Impedance  Voltage(%)No-load Current (%)
High Voltage(KV)Tapping Range of High VoltageLow Voltage (KV)
3020
0.4
90690/6605.52.1
50

1301010/9602
63

1501200/11501.9
80

1801440/13701.8
100

2001730/16501.6
125

2402080/19801.5
160
Dyn112902540/24201.4
200±5%Yzn113403000/28601.3
250±2x2.5%Yyn04003520/33501.2
315

4804210/40101.1
400

5704970/47301
500

6805940/56601
630

810682060.9
800

98082500.8
1000

1150113300.7
1250

1380132000.7
1600

1660159500.6
2000

1950191400.6
2500

2340222000.5
Note: The data in the table is subject to change as required. 

 

 

Production Flow

Low-voltage foil winding area:

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

 

Case Storage Area:

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

 

Coil installation:Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

 

Assembly:

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv

 

Testing: 

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv 

Packaging & Shipping

Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv 

After Service

1.Our company provides you with project design and process design, and designs and manufactures products according to your equipment purchase plan and specific needs. And train technical and operating personnel for you.

2.The newly purchased products are provided with online assistance for installation and debugging. The products are under the lifelong service system. If problems occur in normal use, we will provide solutions within one working day after receiving user's feedback. We will try our best to get the product up and running as soon as possible. And there are regular visits by professional technicians to ensure the long-term, safe and reliable use of our products.

3.We use quality authentic materials, process and manufacture in strict compliance with ISO9001:2000 international quality management to ensure the quality of excellence and the smooth installation!

Company Information

TSTY Electric Co., Ltd. was established in 2007 and is an excellent and reliable transformer manufacturer in China. The company mainly develops and produces oil-immersed transformers, dry-type transformers, box-type substations and high and low voltage complete sets of equipment.

The equipment put into production and operation of the project advocates energy saving, intelligence, information and mechanization. The company has established the Henan Triangle Energy-saving Transformer Engineering Technology Research Center, with 71 utility model patents and 15 invention patents.

With years of accumulation in the transformer industry and strong technological innovation capabilities, it provides comprehensive solutions for the Chinese power industry. The company is a key procurement unit for large-scale national projects such as State Grid, State Railway Administration, Zhengzhou Coal Group, Pingmei Group and South-to-North Water Diversion.

 Power Transformer Cost S11 20kv 33/0.4kv 200 kva 11/0.4kv


Hate 0
Favorite 0
Comment 0
Contact
Buy