Share BuyProducts Channel
1/5
4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter / 14 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter / 24 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter / 3

4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter

2023-01-04 16:223030
Price ¥21.68/Piece
Min quantity 1Piece
Quantity 999Piece
Deliver In 7 days

Overview

Essential details

Supply Ability

Packaging & delivery

4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter YEM024SJ-N

4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter YEM024SJ-N4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter YEM024SJ-N

Technical Parameters

 

Model AccuracyFrequencyDimension 
Connection Mode
YEM024SJ-N1.050/60HZ88x75x73mmDirectly/CT/CT&PT
Rated VoltageRated Current Starting CurrentDisplay ModeInsulation Performance
3x127V/220V, 3x230V/400V
5(80)A 10(60)A 20(100)A    0.02A, 0.04A,  0.08A LCD 6+1        AC voltage 4kv             for 1 minute,1.2/50us wavefrom  impulse voltage 6kv

Dimension

  4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter YEM024SJ-N4 Poles Modules Small Size Three 3 Phase Din Rail Electricity Electric Digital watt kwh Energy Meter YEM024SJ-N

 

1 Where is your factory?

Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.

2 Are you manufacturer or business?

We are manufacturer established in 2002, and have over 16 years production experience.

3. Can I ask for samples?

Yes 

4. What's the warranty of your products?

18 months

5. What's the lead time?

Depend on the quantity and model of the order, normally it takes around 2-3 days, but the exact lead time should be discussed  with our sales.

6. How about the MOQ, Payment term, Delivery port, and shipping date?

1)MOQ: 100 pcs/item based on existing packing.

2)T/T-30% deposit and 70% against copy of BL

3)L/C is also acceptable

4)Ningbo/Shanghai

 

Show more details

Packaging & delivery

Current Transformer Connect Din Rail Three Phase Four Wire LCD Display Electronic Energy Meter

 

Current Transformer Co<i></i>nnect Din Rail Three Phase Four Wire LCD Display Electro<i></i>nic Energy Meter

 

 

Product Description

Model YEM421JC three phase four wire electronic DIN rail active and reactive

 

integration energy meter is a kind of new style three phase four wire active energy

 

meter, it adopts micro-electronics technique, and imported large scale integrate circuit,

 

uses advanced technique of digital and SMT techniques, etc. The meter completely

 

accord with relevant technical requirements of class 1 three phase active energy meter

 

stipulated in international standard IEC 62053-21 and class 2 three phase reactive

 

energy meter stipulated in international standard IEC 62053-23. It can accurately and

 

directly measure 50Hz or 60Hz active and reactive energy consumption from three

 

phase four wire AC electricity net, it can display total energy consumption by step

 

motor type impulse register.This meter has seven digits LCD displays shows active

 

energy.It has following features:good reliability, small volume, light weight, specious

 

nice appearance, convenient installation, etc.

Features

Dimension and wiring

 Current Transformer Co<i></i>nnect Din Rail Three Phase Four Wire LCD Display Electro<i></i>nic Energy Meter

 

Current Transformer Co<i></i>nnect Din Rail Three Phase Four Wire LCD Display Electro<i></i>nic Energy Meter

 

1 Where is your factory?

Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.

2 Are you manufacturer or business?

We are manufacturer established in 2002, and have over 16 years production experience.

3. Can I ask for samples?

Yes 

4. What's the warranty of your products?

18 months

5. What's the lead time?

Depend on the quantity and model of the order, normally it takes around 2-3 days, but the exact lead time should be discussed  with our sales.

6. How about the MOQ, Payment term, Delivery port, and shipping date?

1)MOQ: 100 pcs/item based on existing packing.

2)T/T-30% deposit and 70% against copy of BL

3)L/C is also acceptable

4)Ningbo/Shangha


Hate 0
Favorite 0
Comment 0
Contact
Buy