Share BuyProducts Channel
1/5
YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimete / 1YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimete / 2YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimete / 3

YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimete

2023-01-04 16:232890
Price ¥21.30/Piece
Min quantity 1Piece
Quantity 999Piece
Deliver In 7 days

Overview

Essential details

Supply Ability

Packaging & delivery

YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimeter/ 3 phase power meter

Product Description

YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimeter/ 3 phase power meterYEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimeter/ 3 phase power meter

Technical Parameters

 

Model AccuracyFrequencyDimension 
Connection Mode
YEM021EI
1.050/60HZ88x125x73mmDirectly/CT/CT&PT
Rated VoltageRated Current Starting CurrentDisplay ModeInsulation Performance
3x127V/220V, 3x230V/400V
5(30)A ,10(60)A,  20(100)A    0.02A, 0.04A,  0.08A LCD 6+1        AC voltage 4kv             for 1 minute,1.2/50us wavefrom  impulse voltage 6kv

Dimension

  YEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimeter/ 3 phase power meterYEM021JC Wholesale Price Factory 3 Phase LCD Display kwh Meter/ low price din rail digital multimeter/ 3 phase power meter

 

1 Where is your factory?

Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.

2 Are you manufacturer or business?

We are manufacturer established in 2002, and have over 16 years production experience.

3. Can I ask for samples?

Yes 

4. What's the warranty of your products?

18 months

5. What's the lead time?

Depend on the quantity and model of the order, normally it takes around 2-3 days, but the exact lead time should be discussed  with our sales.

6. How about the MOQ, Payment term, Delivery port, and shipping date?

1)MOQ: 100 pcs/item based on existing packing.

2)T/T-30% deposit and 70% against copy of BL

3)L/C is also acceptable

4)Ningbo/Shanghai

 

Show more details


Hate 0
Favorite 0
Comment 0
Contact
Buy