Share BuyProducts Channel
1/5
Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate / 1Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate / 2Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate / 3

Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate

2023-01-04 16:293010
Price ¥22.00/Piece
Min quantity 1Piece
Quantity 999Piece
Deliver In 7 days

Overview

Essential details

Supply Ability

Packaging & delivery

Hot Sale RS485 Multi Tariff  Digital Electricity Power Meter /

Single Phase Energy Meter Multi-rate 

Product Description

Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate

Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate

Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate

Technical Parameters

Model AccuracyFrequencySize  Material
YEM031AL 1.050-60HZ88x75x73mmPC

Reference 

Voltage(V)

Current 

Specification(A) 

Staring 

Current(A)

Display 

Mode

Insulation 

Performance

127 V ,230 V5(30)A ,10(50)A, 20(100)A0.02A,0.04A,0.08A 

LCD display 

14 data at most

AC voltage 4kv for 1 minute,

1.2/50us waveform 

impulse voltage 6kv

Dimension and Wiring

 Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate

 

Hot Sale RS485 Multi Tariff Digital Electricity Power Meter / Single Phase Energy Meter Multi-rate

 

 

1 Where is your factory?

Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.

2 Are you manufacturer or business?

We are manufacturer established in 2002, and have over 16 years production experience.

3. Can I ask for samples?

Yes 

4. What's the warranty of your products?

18 months

5. What's the lead time?

Depend on the quantity and model of the order, normally it takes around 2-3 days, but the exact lead time should be discussed  with our sales.

6. How about the MOQ, Payment term, Delivery port, and shipping date?

1)MOQ: 100 pcs/item based on existing packing.

2)T/T-30% deposit and 70% against copy of BL

3)L/C is also acceptable

4)Ningbo/Shangha

 


Hate 0
Favorite 0
Comment 0
Contact
Buy